2006 will be an exciting year for T.D.I. Processing and it's clients. We have installed a new SB-2000 on a 14 inch steel cooling tower codenser line for 1800 tons of cooling for a test of the larger Electronic Descalers at a large Mall. The large units have the capability of handling water treatment requirements up 24 inch steel pipe and 40 inch non-ferrous pipe (plastic fiberglass etc,). We look forward to helping electric and water treatment utilities handle water treatment problems that they could not previously treat.
2007 The Mall unit is still being tested.
There is a new test occuring for energy and water savings in a side to side comparison with chemical treatment on two 250 ton sister cooling tower condenser comfort air systems at a large school system. As of the first month we have saved 4000 gallons a day during the summer and 3500 gallons per day in the cooler late fall weather. In the mild winter we still saved 3000 gallons a day in water usage, versus the chemically treated cooling tower condenser systems. The condensers were inspected in November and ours was spotless.
The Mall test with the SB-2000 is still an ongoing project.
2008 has resulted in the sale of electronic water conditioning for the chemically treated cooling tower condenser water system along with the sale of our test units on the sister system of the 2-250 ton cooling systems we tested in 2007. They again inspected the Trane condenser on the 2- 250 ton Electronically treated systems in and the results were excellent. Both condenser were spotless. We are working on water savings and will be installing water meters on clients and test unit systems bleed-off if they do not have them. Most systems have meters on the make up lines.
We are relocating the coil on the Mall test to a 12 inch line for the two main 600 ton chillers that is a return line to the cooling tower.
In May of 2008 we upgraded the Ft. Lauderdale Mall to 3- WET 2400 Electronic Descalers and unplugged the SB-2000. Although the cost factor would be the same for the 3- WET 2400's the change was due to advanced technology and the results are proving the upgrade is superior.
2009 is proving to be an excellent year. We have installed many more units in the 2007- 2008 dual 250 ton cooling tower system and have documents in for more. The 2-250 ton Coling Tower Condenser systems saved $23,000.00 in water in 2008; versus when they were chemically treated. The upgraded Electronic Descaler and Ionizers are not only competative, but offer superior results to anything else we have worked with. Reports on this site are to follow as we continue this year. The Water District allocated for 7 more Wet 2400 Electronic Descalers and TDI CS 5000 Copper/Silver Ionizers. The school system will have no initial or installation costs!
We have installed a TDI WET-2400 and CS-6000 Copper/Silver Ionizer at a military base for testing. It has operated flawlessly even when the water line to the bleed-off of the cooling tower condenser line was turned off for 5 weeks. We still maintained and cleaned old scale even silica scale with over 40 cycles of concentration. We turned the water suply on after we discovered the chemical man had turned it off and rest to 10 cycles of concentration during clean up. We will turn the cycles of concentratiuon up to 15 cycles in 2010 after the entire system is cleaned.